Construction Safety & TRIR Readiness Scorecard

Score your safety program across 6 domains. Built for PE-backed industrial platforms, GC prequalification, and ISNetworld/Avetta readiness.

Why TRIR Readiness Matters for PE Platforms
GCs set hard TRIR thresholds between 0.5 and 2.0 — exceed them and your bid is rejected regardless of pricing. ISNetworld grades weight TRIR at ~30% and RAVS compliance at 30-40%. A PE-backed roll-up inherits the safety record of every acquired entity. One bad site drags the platform TRIR above threshold.

2024 BLS TRIR Benchmarks (per 100 FTE)

All Private Industry2.3
Construction2.4
Manufacturing3.2
Oil & Gas Extraction0.8
Tier-1 GC Threshold (Bechtel, Fluor, Turner)< 1.0
ISNetworld Preferred Range0.8 – 2.0
Section 1 of 6

Your Scorecard Is Complete

Enter your work email to view your scored results with domain-by-domain breakdown and prequalification readiness assessment.


No spam. Unsubscribe anytime.

Construction Safety Readiness Score
--
/ 100
--

Domain Scores

Contractor & Subcontractor Governance Framework

47 controls, 5 approval gates, safety prequalification, performance tracking, and payment controls. Built for PE-backed industrial platforms managing 10+ contractors across multiple sites.

Get the Framework — $97

PE Operating System Suite

All 12 frameworks including contractor governance, field operations dashboard, KPI tracking, and TRIR-linked safety controls. Plus deployment roadmap and operating cadence template.

Get the Suite — $4,997